With a Heartland turnkey package, steel erection is planned, scheduled and managed by the same company that fabricated your steel. One subcontract covers the steel from shop drawings to the set frame.
Most fit problems show up during erection, when steel from one company meets a crew from another. On our turnkey packages, that handoff stays inside one contract.
Heartland contracts and manages experienced erection crews, plans the erection sequence and ships steel in the order it will be set. If something does not fit, there is one company responsible for making it right.
Structural steel erection is the field work of lifting fabricated beams, columns and braces into place, then plumbing, bolting and welding them to form a building's frame. It follows the erection drawings and is usually done with cranes and specialized ironworker crews.
Everything between our shop door and a plumbed, bolted frame.
Erection sequence planned from the same drawings the shop used, so steel goes up in a logical order.
Experienced erection crews contracted and scheduled by Heartland to match your project timeline.
Crane needs planned with the erection sequence and coordinated with your site and schedule.
Loads shipped in the order the steel will be set, cutting down on laydown space and rehandling.
Steel set, plumbed, bolted and field welded per the erection drawings and project specifications.
Erection is part of our turnkey structural steel packages, with detailing, fabrication and delivery under one contract.
Turnkey steel →Here is what changes when the fabricator owns the erection scope.
How erection fits into a Heartland turnkey package.
Erection order set from the approved drawings.
Crew and crane booked to your site schedule.
The shop builds steel in erection sequence.
Loads arrive in the order they will be set.
The frame is set, plumbed and bolted.
Managed erection works best when steel is on the critical path and the GC wants one accountable sub.
Erection is the last step. These come first.
Structural steel erection is the field work of lifting fabricated steel into place and plumbing, bolting and welding it to form a building's frame. It follows the erection drawings and is typically done with cranes and ironworker crews.
Fabrication happens in the shop, where steel is cut, drilled and welded into finished pieces. Erection happens on site, where those pieces are lifted into place and connected to form the structure.
Steel erection is part of our turnkey structural steel packages. Heartland contracts, schedules and manages experienced erection crews, plans the erection sequence and coordinates cranes and deliveries, so you have one subcontract for the full steel scope.
Not with a turnkey package. Erection is included, and Heartland manages it from start to finish. If you prefer to use your own erector, we can bid fabrication only.
Yes. Our shop is in Woodway, Texas, near Waco, and we take on turnkey structural steel projects for general contractors nationwide.
Fill out the short form on our bid request page or email estimating@heartlandsteeltx.com. Our estimator will follow up to talk through the project and collect your plans and specs. Choose turnkey as the scope.
Request a bid and we will price the full steel package, erection included.